• ED. ZÜBLIN AG
  • SERVICES
  • BIM 5D®
  • CENTRAL TECHNICAL DIVISION
  • TEAMCONCEPT
  • PRESS
  • CAREER
  • DE
Ed. Züblin AG | Newsroom

Welcome to
the Newsroom of
Ed. Züblin AG

Ed. Züblin AG | Newsroom
  • Home
  • Press releases
  • Media
    • Projects
    • Company
    • Innovation & Digitalisation
  • Events
  • Contact
Go
  •  0
    • 0 Files in Lightbox
  • EN
    • Deutsch
    • English

Use of image rights

Dear journalists and media professionals, welcome to our press area. Thank you for your interest in our information offerings about our company, our products and our services. The content presented here for your reporting needs is made available to you by Ed. Züblin AG, Albstadtweg 3, 70567 Stuttgart Germany. Use of the services implies that you agree to these terms of use.

These terms and conditions of use govern the use of the content provided online at https://newsroom.zueblin.de/. Access to the Ed. ZÜBLIN AG newsroom together with its functions and content shall be exclusively in accordance with the aforementioned terms and conditions. These conditions include the provisions on data privacy. By using the service and content provided, you confirm that you have read and accept these conditions.

Exclusive service for media and journalists

Our newsroom offers access to our press releases and news and provides the opportunity to download certain material (text, images, videos, sound bites, brochures). The content provided may be used free of charge. By using our newsroom, you agree to use the content and materials provided exclusively for the purpose of your professional editorial and journalistic activities. Unless otherwise agreed, the image material, data and information are only authorised for use by journalists and members of the press.

Usage rights and intended purpose

The content may be used under a simple usage right solely for the specified purpose relating to the content in question to which the respective material relates. Content may be downloaded free of charge and used within the context of reporting for the following purposes: press publications, publications in print media, publications by film and television, publication in online media, mobile media and multimedia publications. Any use beyond this for commercial purposes of any kind or for private use, including but not limited to advertising purposes, is not permitted and expressly prohibited.

Content and materials may be edited and changed as long as it remains clearly recognisable and no change is made to the content that favours a possible meaning other than that of the original content. The content may not be reproduced in any way that distorts the intended meaning. The material may not be altered in such a way that it becomes unrecognisable from the original.

Use of the content is only permitted for as long as the content is available in the newsroom and is limited to the scope of our company’s activities. Use of the content in an offensive or unlawful manner is not permitted and must be avoided.

Sharing and reproduction

The content may not be shared with and/or reproduced for third parties, unless this is absolutely necessary within the scope of the specified purpose. The electronic storage of image data, data transmission and any other reproduction is only permitted within the scope of the usual production processes and for the duration of the lawful and intended use. It is prohibited to use, store or download content by you or a third party as part of a service that is similar to or replaces the services offered by us.

Copyright, personality rights and legal notice

All content, as well as the design itself, is protected by copyright, personality rights and registered trademark rights as well as by other laws related to intellectual property rights.

All content displayed in the newsroom, such as text, images, videos, audio files, documents and other content offered in the system, is the property of our company, its licensors or external owners who provide content and are named in the system. When using photos, videos or other visual material, you must indicate the name of our company and, if available, the copyright notice, the name of the photographer and/or the name of the agency as well. This also applies to electronic publications.

Except in cases of deliberate intent or gross negligence, we accept no liability that the materials provided do not infringe the rights of third parties or conflict with competition law or other statutory provisions.

Provision of service and content

We make all reasonable efforts to ensure the continuous provision of the services and functions. However, we do not accept any liability for the availability of the content, nor for the access or functionality of the newsroom.

The content made available is provided without guarantee. We exclude any guarantee of completeness, satisfactory quality as well as suitability for a specific purpose of the content provided. Furthermore, we reserve the right to change all content provided in the newsroom without prior notice.

The content may contain links to other websites. We have no control over third-party websites and are not responsible for their content or for any loss or damage that you may suffer as a result of using such third-party websites.

Registration and access

Information provided during registration for the press distribution list or registration for the press login must be correct, up-to-date, truthful and complete. The information must be updated when necessary.

You agree to treat the access data provided to you as confidential and to inform us immediately in the event that it is lost. The security of your user identification is your responsibility. You are liable for any use of the services and content offered and any actions taken with your user identification until you have notified us of the loss and/or alleged misuse.

We reserve the right, at our sole discretion, to refuse your registration in the press distribution list or to block the registration for the press login, as well as not to allow access and/or use of the services and content offered.

Other conditions

We reserve the right to change these terms of use or to adapt these terms of use to the service, for example in order to take account of changes in the legal framework or changes to our services. We therefore ask you to regularly review the terms of use. Changes to the terms of use will be published directly on the website. An amendment to the terms of use will be published at the latest at the time of its entry into force and will not apply retroactively.

In the event that any individual provisions of these terms of use is or becomes invalid or contains a legal omission, the provision will be replaced by a valid provision that corresponds as closely as possible to the intended provision. The validity of the remaining provisions remains unaffected.

These terms of use are governed by the laws of the Federal Republic of Germany. The place of jurisdiction is, as far as permissible, Stuttgart.

Specimen copy

In the event that you write a report on the basis of the content provided, we would be delighted to receive a specimen copy of the publication free of charge at the following address or a link by e-mail:

Ed. Züblin AG
Albstadtweg 3
70567 Stuttgart
Germany
E-mail: presse@zueblin.de

Controller as defined by Article 18 (2) of the German State Media Treaty (Medienstaatsvertrag – MStV)”
Ed. Züblin AG
Birgit Kümmel
Corporate Communications
Tel. +49 221 824-2472
presse@zueblin.de


We hope that our press service can support you in your work and we look forward to your reporting.

  • Press releases /
  • Press releases
  • Alle
  • Text
  • Videos
28.01.2019 | 1 Video

ZÜBLIN realising for Deutsche Bahn a reinforced concrete roof that is a work of art

ZÜBLIN, Stuttgart 21, Nominated for bauma innovation award 2019
ZÜBLIN, Stuttgart 21, Nominated for bauma innovation award 2019

With the construction of the chalice supports for the Stuttgart 21 project, Züblin is nominated for bauma innovation award 2019.

This press release has:
With chalice-shaped pillars for Stuttgart’s underground train station, Ed. Züblin AG sets new standards in building construction and civil engineering. Innovative techniques and digital processes push previous boundaries of constructability. Complex freeform formwork developed by ZÜBLIN Timber to realise the architectural design by Christoph Ingenhove

Press release Plain text

  • With chalice-shaped pillars for Stuttgart’s underground train station, Ed. Züblin AG sets new standards in building construction and civil engineering
  • Innovative techniques and digital processes push previous boundaries of constructability
  • Complex freeform formwork developed by ZÜBLIN Timber to realise the architectural design by Christoph Ingenhoven

With a boldly curved shape, snow white and completely smooth with absolutely no pores or visible joints, the massive “chalice” juts skyward above the construction site in Stuttgart. At the top, about 12 m up, the projecting chalice roof surrounds the “scoop” for the “light eye” and stretches up to 32 m in diameter over the delicate, downward-tapering foot – it is a work of art poured from concrete, weighing in at 2,500 t. The first of 28 chalice-shaped columns that will combine to hold the roof of Stuttgart’s new underground through station was completed in October 2018. The award-winning design by architect Christoph Ingenhoven is being realised by ZÜBLIN on behalf of client Deutsche Bahn AG as part of the Stuttgart 21 railway and urban development project. To build this challenging structure, the number one in the German building construction and civil engineering sector is applying innovative methods and digital techniques that are pushing the previously valid boundaries of buildability. The impressive shell roof with its enormous free-formed structures, inspired by the aesthetics of gothic cathedrals, puts extreme demands on the reinforced concrete structure with regard to form and function. “Something like this,” says ZÜBLIN project manager Ottmar Bögel, “has never been built before.”

High-tech glued laminated timber for the formwork

The 28 columns represent a structural challenge not only for their fundamentally complex geometry but also because each “chalice” is unique, having its own inclination, shape and height (8.5–13 m). The necessary processes for their production were largely designed from scratch. ZÜBLIN Timber GmbH, a member of the project team under the direction of general contractor ZÜBLIN Subdivision Stuttgart, applied its expertise in timber engineering to design the formwork responsible for the pillars’ unique shape. The approximately 500 individual three-dimensional formwork elements are CNC-machined to high precision from spruce blocks at the factory in Aichach with toolpaths derived directly from the model via a parametric surface interpolator. Planned/actual comparison for quality control is made possible by a 3D laser scanner and an integrated BIM.5D environment with closed-loop data workflow. To meet the architectural requirement of creating a highest-quality raw concrete surface with no pores or visible joints, the machined formwork elements are coated with a special resin mix in a lacquering line designed specifically for the project. Each element is used multiple times in various combinations on the construction site, with special elements for the foot and edges of the chalice to create the different geometries of each of the pillars.

11,000 rebars used for pillar reinforcement

The process of creating the custom reinforcing bars is similarly complex. The complicated geometry of the chalice-shaped pillars is reflected in the reinforcement, which comprises approximately 11,000 different, partly three-dimensionally bent rebars, many of them unique. The steel is shaped in a bending facility established especially for this project mainly via interpolator between bending machine and reinforcement model. Quality control is performed using true-to-scale laser projection. The installation of the rebars and formwork in the reinforcement model is coordinated using BIMPLUS® software that was evolved specifically for the task in cooperation with software developer ALLPLAN. Each chalice requires about 450 designs to depict the extremely complex reinforcement details. To assist in the installation, the 3D model is used directly on the construction site via a large screen in the site container and as a mobile tablet solution.

In order to realise the aesthetic requirement of a smooth white surface, the concrete used for the columns was specially redesigned to create a white concrete with the necessary structural properties. Polypropylene fibres were added to meet the fire safety requirements.

Concreting in three phases

Each pillar is concreted in separate phases. First, the foot of the chalice is poured, the height of which (up to 7.20 m) can be varied using three different sets of formwork. This is followed later by the chalice itself, with around 700 m³ of concrete for its sweeping 6 to 6.50 m high shape. The final step is the concreting of a “scoop” on top of the chalice roof surrounding an opening 16 m in diameter for the “light eye”.

The second pillar is scheduled for completion in March 2019. From the middle of the year, three chalices are to be built parallel to each other. When six finished chalices stand together as a group, the remaining space in between will be slowly filled. The one-of-a-kind structure is to be completed by late 2022. The 28 light domes will then protrude from out of Straßburger Platz and the aboveground green roof in Schlossgarten Park. They will help to evenly distribute daylight through the bright chalices into the underground station hall to create a friendly, light-flooded atmosphere.

All contents of this press release as .zip:

Direct download

Release text (5460 Characters)

Plain text Copy release text

Videos (1)

  • ZÜBLIN, Stuttgart 21, Nominated for bauma innovation award 2019
    ZÜBLIN, Stuttgart 21, Nominated for bauma innovation award 2019
    | | 6,7 MB ©
    File size: 6,7 MB | .mp4
    |
    ZÜBLIN, Stuttgart 21, Nominated for bauma innovation award 2019
    ©

    With the construction of the chalice supports for the Stuttgart 21 project, Züblin is nominated for bauma innovation award 2019.


Related

  • 07.01.2022
    Markus Landgraf appointed to the Management Board of Ed. Züblin AG
  • 16.07.2021
    ZÜBLIN completes exterior structural frame for AirportAcademy at Munich Airport using in-situ concrete
  • 07.05.2020
    ZÜBLIN Timber building Collegium Academicum residence hall in Heidelberg
  • 18.12.2018
    STRABAG expands its range of services in digital surveying
  • 17.12.2018
    Residential construction contract worth approx. € 80 million for ZÜBLIN in Berlin
  • 06.12.2018
    Deutsche Bahn awards first two contracts for main construction works on Munich’s second core route
  • 28.11.2018
    MoosTex: Active watering regulates ability of moss panels to bind particulate matter
  • 06.11.2018
    STRABAG subsidiary ZÜBLIN awarded contract to build school centre in Nuremberg
  • 25.10.2018
    Hall 12 officially opened
  • 16.10.2018
    Cornerstone ceremony for new corporate site in Markgröningen

Contact

(01) Birgit Kümmel (englisch)

Birgit Kümmel
Corporate Spokeswoman (dep.)/
Head of International Comms.
presse@strabag.com
+49 221 824-2480


(02) Sabine Appel (englisch)
Sabine Appel
PR-Manager
Corporate Communications
sabine.appel@strabag.com
+49 221 824-2159
ZÜBLIN, Stuttgart 21, Nominated for bauma innovation award 2019

ZÜBLIN, Stuttgart 21, Nominated for bauma innovation award 2019 (.mp4)

With the construction of the chalice supports for the Stuttgart 21 project, Züblin is nominated for bauma innovation award 2019.

©
6,7 MB
Direct download
Save to lightbox
A video is located on an external platform (incl. US providers). For privacy reasons, direct playback in the preview is prevented.
You can set your consent for content from external platforms. This will place cookies from the external platform on your computer.
A video is located on an external platform (incl. US providers). Revoke consent.
File size: 6,7 MB | .mp4
|
ZÜBLIN, Stuttgart 21, Nominated for bauma innovation award 2019
©

With the construction of the chalice supports for the Stuttgart 21 project, Züblin is nominated for bauma innovation award 2019.


Data Protection Statement

Imprint

Legal Notice

Contact
Ed. Züblin AG | Albstadtweg 3 | D-70567 Stuttgart | Tel. +49 711 7883-0 | Fax +49 711 7883-390 | info@zueblin.de
SIGN UP
Subscribe to our press distribution list and receive all news from Ed. Züblin AG by e-mail:

Mailing list

GTC
Privacy Policy
Imprint
Cookie Settings